SECTION XII-1 ROAD, STRUCTURES,DRAINAGE PACKAGE 3
|
27 August 2020 |
SECTION XII-2 ROAD CROSS SECTIONS PACKAGE 3
|
27 August 2020 |
SECTION XII-3 STANDARD PACKAGE 3
|
27 August 2020 |
INSPECTION AND EVALUATION OF EXISTING BRIDGE REPORT
|
27 August 2020 |
BD Part1-Bidding Procedures OPBRC NR13S (Final)
|
27 August 2020 |
BD Part2-Work Service Required OPBRC NR13S Package3 (Final)
|
27 August 2020 |
BD Part3-ConditionsofContractandContractForms OPBRC NR13S (Final)
|
27 August 2020 |
BRIDGE DESIGN REPORT
|
27 August 2020 |
BRIDGE MAINTENANCE GUIDES
|
27 August 2020 |
GENERAL PROCUREMENT NOTICE
|
27 August 2020 |